Waiting
30. 6. 2024
The lean approach towards construction adopts both physical and non-physical waste production. On the basis of the existing literature, waste in the context of construction can be classified into eight types, namely defects, overproduction, waiting, not-utilizing talent, transportation, inventory excess, motion waste, and excess processing.
Author: Henri Suissa